Engineering Design | Supply | Installation | Control | Programming
Property Owner:
Shakespeare North Playhouse
Client:
Dodd Group
Designer:
Simon Watkinson
Project Team:
Kier Construction | Dodd Group | Helm Architects | Austin Smith Lord Architects | Simon Watkinson | Steve Samosa Photography
Scope of Works:
Engineering Design | Supply | Installation | Control | Programming
Solution:
Studiotech developed a lighting solution for both the façade of the theatre and surrounding public realm in collaboration with Kier Group, Dodd Group (Studiotech Client), Helm Architects, Austin-Smith:Lord and Simon Watkinson.
Studiotech worked closely with Simon, Lead Artist, during the commissioning stage to ensure his aspirations were met throughout the phasing colour change of the dynamic lighting.