Client:
Dodd Group
Designer:
Simon Watkinson
Project Team:
Kier Construction | Dodd Group | Helm Architects | Austin Smith Lord Architects | Simon Watkinson | Steve Samosa Photography
Scope of Works:
Engineering Design | Supply | Installation | Control | Programming
Project Details:
Studiotech developed a lighting solution for both the façade of the theatre and surrounding public realm in collaboration with Kier Group, Dodd Group (Studiotech Client), Helm Architects, Austin-Smith:Lord and Simon Watkinson.
Studiotech worked closely with Simon, Lead Artist, during the commissioning stage to ensure his aspirations were met throughout the phasing colour change of the dynamic lighting.
Shakespeare North Playhouse Case Study
Solution Façade | Public Realm | Immersive & Experiential
Images © Steve Samosa Photography