Client:
Morrison Construction
Designer:
JM Architects
Project Team:
Morrison Construction | Castle Building Services | JM Architects
Scope of Works:
System Design | Supply | Installation
Project Details:
As a systems integrator, Studiotech tailors each package to suit the campus’ requirements, in this case various products were selected to provide an optimum solution.
This specific package included ETC and Prolight LED luminaires, Sony and Epson video projectors, Yamaha and RCF and Citronic speakers, Electric 4m Wide projection screens, Biamp CD/Bluetooth multimedia players with the full control and integration using Q-Sys software and our custom built touch screen lecturn which can be positioned anywhere in the space.
The system also allows the ability for the supplied Lighting and Sound desks to be plugged in for full production. Alongside the main performance systems, a full suite of hardware and software was provided to the music department's recording studio with interfacing between the classrooms via facility panels and additional sound playback systems to the music rooms.
Winchburgh Primary School – Full Case Study Coming Soon!